IT that keeps batches releasing, CoAs going out, the DCS walled off.IT that keeps batchesreleasingCoAsgoingouttheDCSwalledoff
Managed IT and security for chemical plants, built around the line between business systems and the control room.
Chemical plant IT
A business network that never reaches the reactor
In a chemical plant, the stakes of an IT incident aren’t just lost orders. Lab results gate batch release, process safety records must be current, and the business network sits one misconfigured connection away from the control room. Here’s where that boundary weakens, what we put in place on the IT side, and how your operations team benefits.
01 · The pressure
Records, results and release all ride on IT
Operators run the process on the DCS, but almost everything around it lives on the business side. The lab enters results in LIMS before quality can release a batch and send the CoA. Engineers update P&IDs and management-of-change files. EHS keeps SDS libraries and PSM documentation current for audits and for the people who need them on shift. Customer orders, shipping papers and ERP inventory run on the same network. Lose it and product sits in tanks waiting.
- LIMS results gate every batch release
- PSM and MOC files must stay current
- SDS access has to work on every shift
SAP S/4HANALabWare LIMSThermo Fisher SampleManager LIMSAVEVA PI SystemEmerson DeltaVAspen PlusSpheraVelocityEHS
02 · How it breaks
The historian link nobody documented
Over the years, someone connected the plant historian so the business side could see production data. A vendor installed remote access on an engineering workstation that talks to the DCS. A dual-homed PC bridges both networks so a report would run. Then a phished user in purchasing gives an attacker a foothold, and those undocumented paths let it move toward the control layer. Even when it stops short, ransomware on the business side can halt shipping and lab release.
- Undocumented historian and reporting links
- Dual-homed PCs bridging IT and control networks
- Vendor remote tools on engineering stations
SAP S/4HANALabWare LIMSThermo Fisher SampleManager LIMSAVEVA PI SystemEmerson DeltaVAspen PlusSpheraVelocityEHS
03 · What we change
Find every crossing, then control it
We map every connection between business and control networks with your controls engineers, then consolidate them into a defined boundary: a DMZ for the historian replica, a jump host with MFA for remote engineering, and firewall rules that allow only what’s needed. Dual-homed machines get retired. Vendor access goes through recorded, time-limited sessions. On the IT side we add endpoint detection, immutable backups for LIMS, ERP and document systems, and tested restores. DCS changes stay with your controls team and vendor.
- A DMZ and jump host at the IT/OT boundary
- Recorded, time-limited vendor sessions
- Immutable backups for LIMS and PSM records
SAP S/4HANALabWare LIMSThermo Fisher SampleManager LIMSAVEVA PI SystemEmerson DeltaVAspen PlusSpheraVelocityEHS
04 · The after
Audits and insurers get straight answers
Your operations manager can point to a diagram that shows exactly how the business network reaches the control layer, and why nothing else does. Lab release keeps moving even if an office workstation is infected. PSM auditors find current documents with change history. Your insurer’s questionnaire about segmentation, remote access and backups gets answered with evidence. And your controls engineers stop being dragged into email and printer problems.
- A documented IT/OT boundary you can show
- Lab release unaffected by office incidents
- Insurance answers backed by real evidence
SAP S/4HANALabWare LIMSThermo Fisher SampleManager LIMSAVEVA PI SystemEmerson DeltaVAspen PlusSpheraVelocityEHS