IT that keeps bids in on time, surfaces current, yards connected.IT that keeps bidsinontimesurfacescurrentyardsconnected
Managed IT and security for civil contractors, from the estimating room on letting day to the far end of the job.
Heavy civil IT
From letting day to final grade
Heavy civil work stretches IT thin: an estimating team racing a submission deadline, foremen entering time on tablets in the dirt, surface models moving between the survey office and equipment in the field, and yards and plants at the edge of cell coverage. Here’s where it breaks for civil contractors and how we hold it together.
01 · The pressure
Bid deadlines and miles of right-of-way
Estimators build unit-price bids in HeavyBid or B2W and submit them through electronic bidding systems before a cutoff that won’t move. Foremen log hours, quantities and equipment in field apps. Survey and engineering staff prepare surface models and alignments for machine control. Equipment managers watch telematics and maintenance. Payroll handles prevailing wage reports for public jobs, and safety tracks CDL driver files. One failure on letting day or one bad surface file costs real money.
- Hard electronic bid submission deadlines
- Surface models feeding GPS-guided equipment
- Prevailing wage payroll on public projects
HCSS HeavyBidHCSS HeavyJobB2W SoftwareTrimble Business CenterTopcon MAGNETViewpoint VistaBid Express
02 · How it breaks
Letting night, one server and a shared login
The estimating database sits on a single aging server with backups nobody has tested. Bid submission credentials are shared among estimators and saved in a browser. Surface model files get passed around by USB stick or personal file-sharing links, and the wrong version reaches a dozer. Foremen share tablet logins, so time entries can’t be traced. A phished email convinces accounting that a trucking subcontractor changed banks right before a large haul payment.
- Estimating on one server with untested backups
- Shared bid submission logins in a browser
- Wrong surface versions reaching the field
HCSS HeavyBidHCSS HeavyJobB2W SoftwareTrimble Business CenterTopcon MAGNETViewpoint VistaBid Express
03 · What we change
Protect the bid, control the files, connect the field
Estimating databases get monitored servers or hosted environments with tested backups and a documented recovery plan for letting day. Bid submission and digital ID credentials go into a password manager with MFA and named users. Surface models and survey data move through a controlled, versioned workflow in your machine control vendor’s cloud or a managed share; machine-side configuration stays with your dealer. Foremen get managed rugged tablets with individual logins. Yards and plants get business-grade connectivity with failover.
- Tested recovery plan for letting day
- Named bid credentials with MFA
- Versioned surface model handoff to the field
HCSS HeavyBidHCSS HeavyJobB2W SoftwareTrimble Business CenterTopcon MAGNETViewpoint VistaBid Express
04 · The after
Bids go in and the field runs on current data
On letting night, estimators work on a system you know will hold, and if it doesn’t, there’s a tested recovery plan. Only named people can submit bids, each with their own credential. The survey office knows which surface version every machine is running. Foremen’s time and quantity entries are traceable, which makes payroll and prevailing wage reports cleaner. Yard and plant offices stay online. And the trucking sub gets paid to the right account.
- Confident letting nights
- Traceable field time and quantities
- Haul payments reaching the right account
HCSS HeavyBidHCSS HeavyJobB2W SoftwareTrimble Business CenterTopcon MAGNETViewpoint VistaBid Express