IT that keeps pours on time, breaks on file, retainage coming.IT that keeps poursontimebreaksonfileretainagecoming
Field phones, takeoffs, test reports and pay apps handled for flatwork, foundation, tilt-wall and structural concrete crews.
Concrete contractors
Batch ticket to final break
A concrete job is a series of short, expensive windows. Forms and rebar get inspected, trucks get ordered, the pour happens and the crew finishes before the slab sets. Afterward, test results and paperwork decide whether you get paid. Your IT has to work at five in the morning and again at month-end billing.
01 · The pressure
Trucks batched at 5 a.m. don't wait
On pour day, the foreman confirms loads with the ready-mix supplier, checks the latest layout and embed plan, and coordinates the pump. Estimators keep takeoffs in STACK or PlanSwift, and PMs track rebar and post-tension shop drawings. After the pour, cylinder break reports come back from the testing lab. If a phone dies, a layout is outdated or a report disappears, the cost shows up as rework or a held payment.
- Loads ordered from a phone before sunrise
- Layouts and embed plans checked on tablets
- Cylinder break reports tied to payment
STACKPlanSwiftBluebeam RevuProcoreCOMMANDconnect by Command AlkonGiatec SmartRockFoundation SoftwareSage 300 Construction and Real Estate
02 · How it breaks
A fake supplier invoice and a stale layout
Concrete subs move a lot of money through a few inboxes. An attacker gets into the office manager's email and sends a supplier-style invoice with new bank details. Meanwhile, a superintendent's tablet still holds last month's layout because it never synced, so anchor bolts land in the wrong spot. Crew phones are personal devices with no passcode, and a foreman who quit still has access to the project app.
- Supplier invoices forged from a hijacked mailbox
- Tablets showing outdated layouts
- Departed foremen still in project apps
STACKPlanSwiftBluebeam RevuProcoreCOMMANDconnect by Command AlkonGiatec SmartRockFoundation SoftwareSage 300 Construction and Real Estate
03 · What we change
Managed devices and verified payments
We enroll company and personal field devices in management, so work apps and files stay encrypted and can be removed when someone leaves. Project folders sync the current layout and shop drawings automatically, with version history. Email and accounting get MFA, and a call-back rule applies to any supplier banking change. Test reports, silica records and daily logs go into backed-up, organized storage instead of scattered inboxes.
- Field devices enrolled and encrypted
- Auto-synced layouts with version history
- Call-back rule for supplier bank changes
STACKPlanSwiftBluebeam RevuProcoreCOMMANDconnect by Command AlkonGiatec SmartRockFoundation SoftwareSage 300 Construction and Real Estate
04 · The after
Paperwork that gets you paid
When a GC questions a slab, you pull the break reports, pour logs and approved layout in minutes. A foreman who leaves loses access to every app the same afternoon. Your controller pays suppliers knowing a bank change triggers a phone call. And when an insurer or a GC's prequalification form asks about MFA and backups, you have a short, honest answer.
- Break reports and pour logs found in minutes
- Same-day removal for departing crew
- Honest answers for prequal forms
STACKPlanSwiftBluebeam RevuProcoreCOMMANDconnect by Command AlkonGiatec SmartRockFoundation SoftwareSage 300 Construction and Real Estate