IT that keeps hulls on schedule, Navy data fenced, the pier connected.IT that keeps hullsonscheduleNavydatafencedthepierconnected
CMMC groundwork, 3D model support and waterfront networks for yards that build, convert and repair vessels.
Shipbuilding and repair
From keel block to sea trials
A vessel is built or repaired on a calendar the owner set months ago. Design releases drive steel orders, planners turn models into work packages, and crews on the waterfront need the right drawing at the right frame number. When a repair contract comes from the Navy, the files carry federal rules with them.
01 · The pressure
A dry dock date that won't move
Your schedule is fixed to a dock window, a tide and a crew of trades who are already booked. Designers work in ShipConstructor, AVEVA or Cadmatic on models that strain an ordinary PC. Planners pull those models into work packages and material lists, and the waterfront prints them by zone. If the design server is down for a day, steel cutting stalls. If Navy files leak, the yard's next bid is in doubt.
- Dock windows booked months ahead
- Ship models too heavy for ordinary PCs
- Work packages printed zone by zone
SSI ShipConstructorAVEVA MarineCadmaticRhinoAutoCADDeltek CostpointMicrosoft 365 GCC High
02 · How it breaks
Navy drawings on a planner's personal laptop
Controlled files rarely leave through a dramatic hack. A planner copies a technical package to a USB stick to work at home. A visiting subcontractor joins the office Wi-Fi and sees the design share. The yard's generic waterfront login is written on a whiteboard in the tool crib. Then a phishing email reaches the contracts manager during an availability, and an attacker now reads every message about change orders and government-furnished equipment.
- Technical packages copied to USB drives
- Subcontractors sharing the office network
- Generic logins posted in the tool crib
SSI ShipConstructorAVEVA MarineCadmaticRhinoAutoCADDeltek CostpointMicrosoft 365 GCC High
03 · What we change
A fenced zone for federal files
We map where controlled information enters and travels, then build a scoped environment for it, often Microsoft 365 GCC High with locked-down design shares. Design workstations get managed endpoint protection and blocked removable media. The waterfront gets its own network, separate from engineering, with a guest segment for subcontractors. Everyone gets a named account with MFA, and we write the System Security Plan and POA&M that CMMC assessors expect to read.
- GCC High or a similar scoped enclave
- Separate networks for yard, office and guests
- SSP and POA&M kept current
SSI ShipConstructorAVEVA MarineCadmaticRhinoAutoCADDeltek CostpointMicrosoft 365 GCC High
04 · The after
A yard the prime contractor trusts with files
When a prime or a Navy program office asks for your SPRS score and supporting evidence, you have it on file. Designers open big models without waiting, and a crashed workstation gets rebuilt from a standard image. Subcontractors get Wi-Fi on the pier without touching engineering. The contracts manager knows a strange email about wire instructions gets verified by phone, and the next availability starts with fewer surprises.
- SPRS score backed by real evidence
- Workstations rebuilt from a standard image
- Pier Wi-Fi kept away from engineering
SSI ShipConstructorAVEVA MarineCadmaticRhinoAutoCADDeltek CostpointMicrosoft 365 GCC High